Erosion and Sediment Control
Peak Environmental Concepts, Inc. offers specific erosion control solutions that maintain water quality while reducing erosion-related cost overruns and project delays. Our Certified Professionals in Erosion and Sediment Control (CPESC) have extensive skills in BMP installations, inspections for SWPPP compliance, site stability, and detention/retention pond construction and maintenance. Our typical erosion control projects vary in size and scope, but rely on many of the same component's for proper control of the physical site. We service builders, developers, municipalities, as well as public highway and construction projects. Our services are listed below, please contact us for a free quote.
What Our Clients Are Saying...
"Peaks installation and maintenance of our storm water pollution prevention plan allowed my site contractor to stay on schedule despite a rainy summer on an environmentally sensitive site. I have spent years trying to get site contractors to properly install SWPPP's, the problem is most of them can't afford to lose the time out of their machines. When Terry approached me during the bidding phase, he put a very competitive price on the SWPPP installation and gave us a very reasonable T&M Scale for the maintenance. Peaks installations were timely, practical, and professional. Terry worked with the engineer to make changes in the SWPPP that saved us thousands. I can't say enough about this service. I highly recommend it."
-Paul Lambert
Project Manger, Bonacio Construction
Scope of Erosion and Sediment Control:
- Turf Re-Enforcement Mats (TRM)
- Erosion Control Blankets (ECB)
- Silt fence and check dams
- Hay mulch/hydro-seed
- Protection of inlet drainage structures
- Weekly storm water inspections
- Assistance with regulation compliance
Are you paying too much for your storm water inspections? Contact us for a free quote.





